FLEXIBLE BOLLARD FROM TUR-IN ROAD KOREA
Tur-In Road is a manufacturer specializing in road safety facilities and has manufactured, sold and constructed various bollards, lane separators for diverse purposes as well as various traffic safety facilities under Mobility Enhancement for the Mobility Impaired Act considering the sound walk environment as the top priority. As a result, we have been able to increase the value of our products and services in order to provide our customers with the best products and services.
Shock Absorbing Buried (self-righting) BollardShock Absorbing Buried (Self-Righting) Bollard Specs
PRODUCT FEATURES
- Elastic rubber, bolt and spring built-in collapses at an angle of about 20 degrees when colliding.
- It can be installed in pedestrian zone such as pedestrian crossing to secure pedestrian safety walking culture.
- It is easy to replace the upper pipe when the upper pipe is damaged, when the shock absorber (injection cap) is broken, when the road is buried or when it is removed.
- Various colors can be customized according to the environment.
Detail view for T1-21 Detail view for T1-22 Detail view for T1-26
BOLLARD CONSTRUCTION METHOD
1. Drill to a depth of 250mm with drilling
drill.
2. Pour concrete into place.
3. Press the bollard in place of concrete pouring, fix it perpendicular to the
floor, and cure it.

FIXED BOLLARD FROM TUR-IN ROAD KOREA


PRODUCT FEATURES
- .Can be replaced when the upper cap is broken. (TI-07, TI-18)
- You can secure the pedestrian’s walking culture by installing pedestrian crossings, etc.
- It can be installed on children’s protection zone, bicycle-dedicated road, and can safety protection function.
- Various colors can be customized according to the environment.
Detail view for T1-07 Detail view for T1-18 Detail view for T1-27
BOLLARD CONSTRUCTION METHOD
- Drill to a depth of 250mm with drilling drill.
- In the center of the drilled hole, insert the auxiliary retaining peg in line with the rubber bolt cap.
- Pour concrete into place.
- Press the bollard in place of concrete pouring, fix it perpendicular to the floor, and Cure it.

You can visit Tur-In Korea for more information.
For any inquiries or questions regarding our products and prices, please contact us in the following ways:
Tel: +603 4270 5430
Email: hafiz@pdsconsulting.com.my